中文‹ Back to Project List

Indonesia Power Plant Dry Coal Shed Space Frame Project

26,000 m² super-long span

ProjectIndonesia Power Plant Dry Coal Shed Space Frame Project
LocationIndonesia
Scale26,000 m², 130m wide × 200m long
ErectionGround pre-assembly + aerial docking (unit-lift + scattered assembly)
Highlights超大跨度干煤棚网架,弧形造型气势恢宏;地面拼装与高空对接组合方案,施工速度快、安全可控,效率优于其他施工方案。
View实拍照片 1
View实拍照片 2
View实拍照片 3
‹ PreviousNext ›
Xuzhou Purun Steel Structure Co., Ltd.
Bolted-ball Space Frames · Tubular Trusses · Reticulated Shells · Roofing Systems